Argus E35Construction

After finishing the major structural molds, construction has started on the first vessel. The main structure is built from 5 molds. Some 20 additional part molds are used for the overall construction.

Build01
Hull and Deck Layup

Deck Part
First deck part out of mold

Deck on hulll
Deck placed on hull

Front Cabin Exposed
Stbd Cabin

Helm Bulkhead
Helm Bulkhead

Topside Assy
First Fit of Topsides

Assembly
Joining Process

Assy Front
Joined and Faired

E35 Dash
Helm Console

Dash Detail
Helm Console - Detail


Engine Installation

Engine Installation
Engine Installation

 Argus Construction
Rails and Roof

Front Brow
Front Brow

 Argus Construction
Roof Aft

 Argus Construction
Roof Aft

 Argus Construction
Roof Front

 Argus Construction
Internal Fairing

Back Beam Engineering
Back Beam Engineering Equipment

Windlass Installation
Windlass Installation

Side Glass Installation
Side Glass Installation

Front Glass Installation
Front Glass Installation

Roof Prep
Roof Attachment

Front Brow
Front Glass and Brow